Skip to content
Monday – Friday: 7 a.m. – 5 p.m.General contractor registration · IL Reg. # 000000Lead-Safe Certified Firm (RRP) · US Cert. # 000000VerifyGeneral liability and workers' compensation
2 more licenses
  • General contractor registration · IL Reg. # 000000
  • Lead-Safe Certified Firm (RRP) · US Cert. # 000000Verify
  • General liability and workers' compensation
(773) 555-0100

What we build

Add room without leaving your block

Every job starts with a site visit and a written scope, and every job comes with the plans and permits.

  • Attic and dormer expansions

    Dormer framing, a stair, heat and finishes for the half-story under the roof.

    Attic expansions
  • Rear additions and bump-outs

    Footings, framing and a roof tied into the back of the house, for a kitchen, a family room or a bedroom.

    Rear additions
  • Second-story additions

    A structural review, new floor framing and a rebuilt roof on a one-story house.

    Second stories
  • Plans, engineering and permits

    Measured drawings, sealed structural pages, a zoning check and the city's review.

    Plans and permits

Not sure which one?

Up, back or into the attic

  • 01

    Into the attic

    The shortest build and the least change to the outside. Limited by headroom and by where the stair can go.

  • 02

    Out the back

    Adds floor area on the ground, next to the kitchen and yard. Limited by the rear-yard setback and the lot.

  • 03

    Up a full floor

    The most new room on the smallest lot. Limited by what the walls and foundation can carry and by the height limit.

We say which one fits your house after the site visit, in writing.

Not sure which one fits?

The site visit answers it. We measure, look and tell you in writing.