What it is

Rear additions and bump-outs

Chicago lots are long and narrow, so the extra room is usually behind the house. A rear addition leaves the front, and the block's look, alone.

The rear-yard setback and the lot's coverage limit how far back we can go, and the back wall of a brick house is usually load-bearing. We check both before we draw.

What's included

  • Footings and a foundation to match the house

  • Framing and a roof tied into the existing one

  • A beam where the old back wall opens

  • Windows, doors and the opening between old and new

  • Wiring, plumbing and heat extended

  • Permit drawings and the city's inspections

An empty room with a new hardwood floor, white trim and an entry door with a transom

What changes the cost

Five things that move a rear-addition estimate

We don't print an average, because the house decides. These are the things that move your written estimate.

  • Footprint and the rear-yard limit

    How far back the zoning lets us go, and how much yard you keep.

  • Foundation depth and soil

    Footings go below the frost line; what the soil is like decides how.

  • Opening the back wall

    A wide opening means a beam, and sometimes posts, to carry the load.

  • A kitchen or bath inside

    Plumbing and cabinets cost more per square foot than a bedroom.

  • Matching brick or siding

    New brick that suits an old wall takes sourcing and a mason.

  • Access and the alley

    Where the dumpster and deliveries can go changes the crew's days.

How it goes

A rear addition, week by week

  1. Weeks 1–2

    Step 1: Site visit and lot measurements, with your plat of survey

  2. Weeks 3–6

    Step 2: Drawings, a zoning check and the engineer's footing and beam pages

  3. Weeks 7–14

    Step 3: City plan review, as a range

  4. Weeks 15–16

    Step 4: Permit, materials and your written schedule

  5. Weeks 17–28

    Step 5: Build: footings, framing, roof, wiring and plumbing, finishes and inspections

Typical ranges, for planning. Your written schedule sets your weeks.

Questions about this job

How far back can we build?

The rear-yard setback and the lot's coverage set the limit. They vary by lot and zoning district, so we check yours in weeks 3 to 6 and tell you before you spend more on drawings.

Do I need a plat of survey?

Usually. It shows the lot lines and what's on them. If you can't find yours, we help you order one.

What happens when you open the back wall?

We shore the wall, set the beam and tell you the day before. The kitchen or room behind it is closed off with plastic until the new space is tied in.

What happens to the yard?

The crew stays inside a marked area and we tell you before anything near a tree or a fence moves.